Infrastructure

Location and Distance

Distance to Golf Ceramics By Road

  • From Ahmedabad City - Golf Ceramics Ltd. 46.7 Miles(75.2 KM) Time Taken - 1 Hour 15 Minutes(Approximately)
  • From Ahmedabad International Airport - Golf Ceramics Ltd. 47.6 Miles(76.6 KM) Time Taken - 1 Hour 15 Minutes(Approximately)
  • From Ahmedabad Railway Station - Golf Ceramics Ltd. 50.8 Miles(81.8 KM) Time Taken - 1 Hour 35 Minutes(Approximately)
  • From Mehsana Railway Station - Golf Ceramics Ltd. 10 Miles(16.1KM) Time Taken - 21 Minutes(Approximately)

Shipping Port Distance to Golf Ceramics By Road

  • Mundra Port - Golf Ceramics Ltd. 214.3 Miles(345 KM) Time Taken - 5 Hour 30 Minutes(Approximately)
  • Kandla Port - Golf Ceramics Ltd. 152.2 Miles(245 KM) Time Taken - 4 Hour 35 Minutes(Approximately)

Manufacturing Process

Slip House

We store all our raw materials over here. The basic raw materials we use are Feldspar, Quartz and clay. They are fed in the desired percentage in the Ball mill along with water and are mixed. The slip, which is the outcome of this process, is the basic raw material for our ceramic products.

Casting

Casting shops are divided into two - battery and bench - depending on the complication of the product. In this department, Greenwares are produced. The atmosphere in the casting shop can be controlled as desired.

Hot Air Dryer

The material from the casting shops is shifted to the dryer. Here, the Greenware is prepared for glazing and firing.

Modeling

In this department, our designers prepare new models or modify new models/existing ones depending on the demands of the market.

Mould-making

In this department, case moulds used in the production are made. First, the case-moulds are prepared and from them running moulds are made that are used in the casting department.

Glaze Preparation

Here, the glaze/colors are prepared which are used in the glazing department to colour the Greenware.

Glazing/inspection department

The Greenware is shifted from the dryer to this department. First, there is an inspection and later different glazes/colors are spread on the product.

Kiln Department

Here, the products from the glazing department are shifted to the kiln on kiln-cars and are put in the tunnel kiln for firing. After firing, the wares are off-loaded and sent to the sorting department. Our kiln is a Natural Gas-based, state-of-the-art German Fabricated machine, designed for best results.

Sorting Department

The wares from the kiln are inspected here, and after proper gradations, shifted to the warehouse.

Dispatch Department

As per orders from customers, the wares are packed and loaded on respective vehicles for timely delivery.

Quality Control

On a daily basis, random pieces are selected for specific quality and functional tests.

Laboratory

The control laboratory is situated close to the raw material, glaze preparation and casting departments and is suitably equipped to control process quality. The production is constantly monitored and together with raw material casting, adjustment of body recipes, matching glaze and body formulations, casting slip tests, grinding and blunging efficiently tests, casting and firing sample trials ensure the right quality of finished product that match international standards. Each and every raw material used goes through various kinds of vigorous tests such as moisture content, physical appearance, particle size distribution, specific gravity, thermal expansion, firing trials and theological property tests, i.e. fluidity, slip concentration, deflocculant demand and casting rate etc.

Stores

It is the place for all material and consumable goods.

Mechanical and Electrical Department

Here all the breakages/ breakdowns of any machinery is taken care of. Preventive measures and well as maintenance is looked after properly.


UTILITIES

Power

The total power requirement of Golf Ceramics has been put at 340 KW. The company has examined the feasibility of Natural Gas-based power generation for electric power and also as a fuel for firing of the kiln, which is economical as compared to the cost of bought out electricity/other conventional fuels.

We at Golf, are using two numbers of Gas-based 250 KVA generator sets. An agreement with Gujarat State Petroleum Corporation Limited (GSPCL) for procurement of 5,000 cubic meters of gas/day with another 5,000 cubic meter/day supply on fallback basis has already been executed for a period of five years at this stage.

Water

We use a Reverse Osmosis Plant for the treatment of the water from the bore well. This helps in improving the quality of the water and also makes it softer; a majority of the hardened particles and chemicals are filtered and taken into to the production for amazing results in the end product.

Care of the Environment

Our production process, at any level, does not give rise to any hazardous chemicals or effluents; so we have not installed any Effluent Treatment Plant as of now.